Rotating work
Use multi-date creation for work, rest, study, routines, or freelance blocks that land on scattered dates.
The important part is the order: turn on multi-select mode first, then choose dates. Tapping dates before multi-select is on only changes the active date.
Do not start by tapping dates. If multi-select mode is off, tapping a date moves the active date instead of building a multi-date selection.
Need to share only selected dates? Use the same round lower-right multi button, select the relevant dates, then use the selected-date sharing flow. See the multi-date guide.
Use multi-date creation for work, rest, study, routines, or freelance blocks that land on scattered dates.
When creating or editing a schedule, use the memo or link picker to connect relevant notes, tasks, or workspace records.
Keep different projects, study areas, or work contexts separated so the calendar is not the only place holding the record.
Use recurring entries and simple repeated schedule blocks for exercise, study, care, medication, or preparation routines.
Use local Scope records for project SOW text, in-scope notes, out-of-scope notes, and extra amount context.
Use the app's backup, restore, purchase, and restore-purchase controls from the app screens where they are available.
These pages explain how Polenest Planner works from the Calendar, Workspace, Cue, Memo, Study Board, and Scope components that are present in the app code. The guides avoid claiming flows that are still disabled, such as timetable auto-sync to Calendar.
Use the round bottom-right multi button to select several dates, add one schedule, and share selected dates.
Create repeating work and routine patterns in Polenest Planner using the Calendar pattern flow, presets, labels, and exception dates.
Use memo links in Polenest Planner to keep preparation notes, meeting records, questions, and context attached to calendar schedules.
Use event colors, pattern labels, manual labels, and monthly Calendar view in Polenest Planner to make busy months easier to scan.
Use Calendar, Workspace, Memo, Cue, and Work Scope Tracker to manage freelancer milestones, client requests, deadlines, and out-of-scope work.
Use Study Board assignment and exam records with Calendar sync in Polenest Planner, while treating Timetable auto-sync as not yet active.
Use Calendar for fixed dates and Cue for short tasks, reminders, and workspace task overlays in Polenest Planner.
Use pattern override labels in Polenest Planner to change only selected dates in a repeating schedule without rebuilding the whole cycle.
Use Polenest Planner Calendar multi-select and share preview to share only selected dates as a calendar image.
A practical Polenest Planner guide for separating dates, tasks, notes, patterns, sharing, and Scope records so schedule planning becomes easier to keep.
What this page does not claim: Timetable automatic calendar sync is not presented as finished, because the current Timetable service returns false for apply-to-calendar.
Make sure multi-select mode is on and at least one date is selected. If no date is selected, the create action has nothing to apply.
Planner uses the normal single-date schedule flow. Select two or more dates when you want one schedule copied across several days.
Yes. Open the schedule again and use the memo or workspace link controls where available.