Freelancer delivery days
Select the draft review, final delivery, and client call dates. Add the project schedule once, then share only those selected dates with the client.
This guide is for schedules that do not sit neatly on every Monday or every weekday. In Polenest Planner, the flow starts from the round multi button floating at the bottom-right of the Calendar screen.
Common searches look like “add the same event to multiple dates,” “select several dates in a calendar app,” “irregular schedule planner,” or “share selected calendar dates.” The real problem is not only adding a schedule. It is explaining scattered dates to yourself, a client, a coworker, a classmate, or a family member without rewriting the same thing again and again.
The multi button is the round floating button at the lower-right corner of the Calendar screen. It looks like a circular action button placed above the calendar surface, so your thumb can reach it before you start choosing dates.
Order matters. Tap the round bottom-right multi button first. After that, date taps become multi-date selections. If you tap dates before turning on multi mode, the calendar simply moves the active date.
Niche but practical: sharing selected dates is useful because people rarely need your whole calendar. They usually need the few dates related to one project, one shift block, or one plan.
Select the draft review, final delivery, and client call dates. Add the project schedule once, then share only those selected dates with the client.
When workdays are scattered, select only the actual work dates. Add “Evening shift” once and share those dates with family or a coworker.
Pick research, writing, review, and submission days. Add one study block without pretending the schedule repeats on a clean weekly rule.
Select only hospital, care, pickup, or preparation days, then share the relevant schedule dates with the person coordinating with you.
| Use this | When it fits | Example |
|---|---|---|
| Multi-date selection | The dates are irregular, scattered, or chosen by hand. | June 4, 6, 11, and 14 all need the same project check-in. |
| Repeat schedule | The rule is predictable and can be described in advance. | Every Monday at 9 AM, or every weekday morning. |
Multi mode is not on yet. Tap the round floating multi button at the bottom right first, then select dates.
Yes. Use multi-date selection to choose the dates that matter, then share the schedules from those selected dates.
No. It also fits study plans, care schedules, family appointments, creator production days, and any calendar where useful dates are scattered.